Spirits, Additives, Distillation. Equipment and ingredients for home production.

Showing 1–36 of 244 results

12 kW Heating Element, 2″ Clamp DN51, AISI 304

65.00 

12 kW Heating Element, 2″ Clamp DN51, AISI 304

9 kW Heating Element, 2″ Clamp DN51, AISI 304

65.00 

9 kW Heating Element, 2″ Clamp DN51, AISI 304

Food-Grade Magnetic Drive Pump MP15MR, 1/2″, AISI 304

185.00 

Food-Grade Magnetic Drive Pump MP15MR, 1/2″, AISI 304

False Bottom with Seal 345 mm, AISI 304, for 45 L Boiler

55.00 

False Bottom with Seal 345 mm, AISI 304, for 45 L Boiler

70 L Distillation / Evaporation Boiler with Dome Lid, AISI 304

360.00 

70 L Distillation / Evaporation Boiler with Dome Lid, AISI 304

45 L Distillation / Evaporation Boiler with Dome Lid, AISI 304

225.00 

45 L Distillation / Evaporation Boiler with Dome Lid, AISI 304

30 L Distillation / Evaporation Boiler with Dome Lid, AISI 304

225.00 

30 L Distillation / Evaporation Boiler with Dome Lid, AISI 304

DN8 / 1/4″ Stainless Steel Needle Valve, Angled, Female/Female Thread, AISI 304

15.00 

DN8 / 1/4″ Stainless Steel Needle Valve, Angled, Female/Female Thread, AISI 304

1/4″ Stainless Steel Needle Valve, Angled, Male/Male Thread, AISI 304

15.00 

1/4″ Stainless Steel Needle Valve, Angled, Male/Male Thread, AISI 304

1/4″ Stainless Steel Needle Valve, Angled, AISI 304

15.00 

1/4″ Stainless Steel Needle Valve, Angled, AISI 304

1/4″ Adapters for Drip Sight Glass

9.00 

1/4″ Adapters for Drip Sight Glass, AISI 304 Stainless Steel

Silicone Gaskets 25 × 25 × 2 mm

9.00 

Silicone Gaskets 25 × 25 × 2 mm, Food-Grade Silicone

Silicone Gaskets 25 × 25 × 3 mm

10.00 

Silicone Gaskets 25 × 25 × 3 mm, Food-Grade Silicone

Digital Kitchen Thermometer with Timer TA-288S

15.00 

Digital Kitchen Thermometer with Timer TA-288S

Sight glass 3″

60.00 

Sight glass, 3″ clamp connection

(Pre-order. Delivery time: 1–2 weeks.)

Sight glass 2″

45.00 

Sight glass 2″

(Pre-order. Delivery time: 1–2 weeks.)

 

Sight glass 1.5″

30.00 

Sight glass DN 50 1.5″

(Pre-order. Delivery time: 1–2 weeks.)

Tubular condenser Ø1.5″ / 38mm, 500 mm, 4 tubes Ø12 mm

65.00 

Tubular condenser Ø1.5″ / 38mm, 500 mm, 4 tubes Ø12 mm

(Pre-order. Delivery time: 1–2 weeks.)

Tubular condenser Ø2″ / 51 mm, 500 mm, 7 tubes Ø12 mm

85.00 

Tubular condenser Ø2″, 500 mm, 7 tubes Ø12 mm

(Pre-order. Delivery time: 1–2 weeks.)

Insulated Column Section for 2″ Clamp, 500 mm, AISI 304

52.00 

Insulated Column Section for 2″ Clamp, 500 mm, AISI 304

(Pre-order. Delivery time: 1–2 weeks.)

Glass Column Section for 2″ Clamp, 550 mm, AISI 304

90.00 

Glass Column Section for 2″ Clamp, 550 mm, AISI 304

(Pre-order. Delivery time: 1–2 weeks.)

Glass Column Section for 2″ Clamp, 350 mm, AISI 304

70.00 

Glass Column Section for 2″ Clamp, 350 mm, AISI 304

(Pre-order. Delivery time: 1–2 weeks.)

Glass Column Section for 2″ Clamp, 250 mm, AISI 304

52.00 

Glass Column Section for 2″ Clamp, 250 mm, AISI 304

(Pre-order. Delivery time: 1–2 weeks.)

Column Section for 2″ Clamp, 500 mm, AISI 304

40.00 

Column Section for 2″ Clamp, 500 mm, AISI 304

(Pre-order. Delivery time: 1–2 weeks.)

Column Section for 2″ Clamp, 300 mm, AISI 304

30.00 

Column Section for 2″ Clamp, 300 mm, AISI 304

(Pre-order. Delivery time: 1–2 weeks.)

Column Section for 2″ Clamp, 250 mm, AISI 304

25.00 

Column Section for 2″ Clamp, 250 mm, AISI 304

(Pre-order. Delivery time: 1–2 weeks.)

Low-Watt-Density Heating Element 3.5 kW, 2″ Clamp, AISI 304

60.00 

Low-Watt-Density Heating Element 3.5 kW, 2″ Clamp, AISI 304

(Pre-order. Delivery time: 1–2 weeks.)

Large Drip Sight Glass for 2–3–4″ Columns, AISI 304

32.00 

Large Drip Sight Glass for 2–3–4″ Columns, AISI 304

(Pre-order. Delivery time: 1–2 weeks.)

Direct-Flow Aftercooler, AISI 304

35.00 

Direct-Flow Aftercooler, AISI 304

(Pre-order. Delivery time: 1–2 weeks.)

Seamless Gin Basket Assembly for 2″ Distillation Units, AISI 304

135.00 

Seamless Gin Basket Assembly for 2″ Distillation Units, AISI 304

Pre-order. Delivery time: 1–2 weeks.

Wash Column 2″

385.00 

Wash Column 2″, AISI 304

Pre-order. Delivery time: 1–2 weeks.

Wash Column 1.5″

350.00 

Wash Column 1.5″, AISI 304

Pre-order. Delivery time: 1–2 weeks.

Automation Unit for Distillation and Rectification with PWM Controller

375.00 

Automation Unit for Distillation and Rectification with PWM Controller

(Pre-order. Delivery time: 1–2 weeks.)

SNT-4000W power and voltage regulator

50.00 

SNT-4000W power and voltage regulator, AC0-220

5 kW voltage and power regulator for heating element, AC 220 V

75.00 

5 kW voltage and power regulator for heating element, AC 220 V